资源类型

期刊论文 166

会议视频 8

年份

2023 10

2022 11

2021 16

2020 12

2019 18

2018 8

2017 19

2016 8

2015 8

2014 6

2013 8

2012 6

2011 2

2010 4

2009 2

2008 7

2007 4

2006 6

2005 2

2004 1

展开 ︾

关键词

城市规划 4

规划 4

乡村规划 3

技术预见 3

规划设计 3

路径规划 3

三峡工程 2

人工智能 2

发展战略 2

可持续发展 2

情景规划 2

智能制造 2

环境 2

(美国) 核管理委员会 1

2008年北京奥运 1

2035年 1

A*算法 1

CAPP 1

CPLEX 1

展开 ︾

检索范围:

排序: 展示方式:

Intelligent optimization of renewable resource mixes incorporating the effect of fuel risk, fuel cost and CO

Deepak KUMAR,D. K. MOHANTA,M. Jaya Bharata REDDY

《能源前沿(英文)》 2015年 第9卷 第1期   页码 91-105 doi: 10.1007/s11708-015-0345-y

摘要: Power system planning is a capital intensive investment-decision problem. The majority of the conventional planning conducted since the last half a century has been based on the least cost approach, keeping in view the optimization of cost and reliability of power supply. Recently, renewable energy sources have found a niche in power system planning owing to concerns arising from fast depletion of fossil fuels, fuel price volatility as well as global climatic changes. Thus, power system planning is under-going a paradigm shift to incorporate such recent technologies. This paper assesses the impact of renewable sources using the portfolio theory to incorporate the effects of fuel price volatility as well as CO emissions. An optimization framework using a robust multi-objective evolutionary algorithm, namely NSGA-II, is developed to obtain Pareto optimal solutions. The performance of the proposed approach is assessed and illustrated using the Indian power system considering real-time design practices. The case study for Indian power system validates the efficacy of the proposed methodology as developing countries are also increasing the investment in green energy to increase awareness about clean energy technologies.

关键词: modern portfolio theory     energy policy     CO2 emissions     multi-objective optimization     planning commission    

Family planning technical services in China

Shang-Chun WU

《医学前沿(英文)》 2010年 第4卷 第3期   页码 285-289 doi: 10.1007/s11684-010-0097-3

摘要: Family planning is a basic state policy in China. Its aim is to control population growth and to enhance population quality. Technical services are the key measures for implementing the family planning policy. In order to ensure that people use safe, effective, and appropriate contraceptive methods based on the government’s commitment, China has established countrywide family planning service networks down to the township level. The people can access various and convenient contraceptive services. In urban areas, all contraceptive services are free. The contraceptive prevalence rate in 2007 was 84.6%, the percentage of intrauterine device (IUD) was 52.3%, that of female sterilization was 32.3%, and that of vasectomy was 6.1%. This means that more than 90% of married childbearing couples were using long-term contraceptives. At the same time, the government gives priority to supporting research on contraceptive technology. Studies’ results have provided scientific evidence for development, introduction, and expansion of contraceptive methods, and also for establishment and revision of the technical guidelines. Great efforts have been made in promoting “human-oriented and client-centered” services during the recent ten years. Remarkable success has been achieved in improving the quality of technical services.

关键词: family planning     contraceptive method     service delivery    

Will Germany move into a situation with unsecured power supply?

Harald SCHWARZ

《能源前沿(英文)》 2019年 第13卷 第3期   页码 551-570 doi: 10.1007/s11708-019-0641-z

摘要: Together with a huge number of other countries, Germany signed the Paris Agreements in 2015 to prevent global temperature increase above 2°C. Within this agreement, all countries defined their own national contributions to CO reduction. Since that, it was visible that CO emissions in Germany decreased, but not so fast than proposed in this German nationally determined contribution to the Paris Agreement. Due to increasing traffic, CO emissions from this mobility sector increased and CO emission from German power generation is nearly constant for the past 20 years, even a renewable generation capacity of 112 GW was built up in 2017, which is much higher than the peak load of 84 GW in Germany. That is why the German National Government has implemented a commission (often called “The German Coal Commission”) to propose a time line: how Germany can move out of coal-fired power stations. This “Coal Commission” started its work in the late spring of 2018 and handed over its final report with 336 pages to the government on January 26th, 2019. Within this report the following proposals were made: ① Until 2022: Due to a former decision of the German Government, the actual remaining nuclear power generation capacity of about 10 GW has to be switched off in 2022. Besides, the “Coal Commission” proposed to switch off additionally in total 12.5 GW of both, hard coal and lignite-fired power plants, so that Germany should reduce its conventional generation capacity by 22.5 GW in 2022. ② Until 2030: Another 13 GW of German hard coal or lignite-fired power plants should be switched off. ③ Until 2038: The final 17 GW of German hard coal or lignite-fired power plants should be switched off until 2038 latest. Unfortunately the “Coal Commission” has not investigated the relevant technical parameter to ensure a secured electric power supply, based on German’s own national resources. Because German Energy Revolution mainly is based on wind energy and photovoltaic, this paper will describe the negligible contribution of these sources to the secured generation capacity, which will be needed for a reliable power supply. In addition, it will discuss several technical options to integrate wind energy and photovoltaic into a secured power supply system with an overall reduced CO emission.

关键词: CO2 reduction     mobility sector     renewable generation     coal commission     secured power generation capacity     reliable power supply     power-to-gas     power-to-heat    

Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex

《化学科学与工程前沿(英文)》 2023年 第17卷 第10期   页码 1516-1532 doi: 10.1007/s11705-022-2283-7

摘要: This paper focuses on the integrated problem of long-term planning and short-term scheduling in a large-scale refinery-petrochemical complex, and considers the overall manufacturing process from the upstream refinery to the downstream petrochemical site. Different time scales are incorporated from the planning and scheduling subproblems. At the end of each discrete time period, additional constraints are imposed to ensure material balance between different time scales. Discrete time representation is applied to the planning subproblem, while continuous time is applied to the scheduling of ethylene cracking and polymerization processes in the petrochemical site. An enterprise-wide mathematical model is formulated through mixed integer nonlinear programming. To solve the problem efficiently, a heuristic algorithm combined with a convolutional neural network (CNN), is proposed. Binary variables are used as the CNN input, leading to the integration of a data-driven approach and classical optimization by which a heuristic algorithm is established. The results do not only illustrate the detailed operations in a refinery and petrochemical complex under planning and scheduling, but also confirm the high efficiency of the proposed algorithm for solving large-scale problems.

关键词: planning     scheduling     refinery-petrochemical     convolutional neural network     heuristic algorithm    

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI, Minglei YANG, Wenli DU, Xin DAI

《工程管理前沿(英文)》 2020年 第7卷 第3期   页码 373-383 doi: 10.1007/s42524-020-0123-3

摘要: Production planning and scheduling are becoming the core of production management, which support the decision of a petrochemical company. The optimization of production planning and scheduling is attempted by every refinery because it gains additional profit and stabilizes the daily production. The optimization problem considered in industry and academic research is of different levels of realism and complexity, thus increasing the gap. Operation research with mathematical programming is a conventional approach used to address the planning and scheduling problem. Additionally, modeling the processes, objectives, and constraints and developing the optimization algorithms are significant for industry and research. This paper introduces the perspective of production planning and scheduling from the development viewpoint.

关键词: planning and scheduling     optimization     modeling    

Ant colony optimization for assembly sequence planning based on parameters optimization

Zunpu HAN, Yong WANG, De TIAN

《机械工程前沿(英文)》 2021年 第16卷 第2期   页码 393-409 doi: 10.1007/s11465-020-0613-3

摘要: As an important part of product design and manufacturing, assembly sequence planning (ASP) has a considerable impact on product quality and manufacturing costs. ASP is a typical NP-complete problem that requires effective methods to find the optimal or near-optimal assembly sequence. First, multiple assembly constraints and rules are incorporated into an assembly model. The assembly constraints and rules guarantee to obtain a reasonable assembly sequence. Second, an algorithm called SOS-ACO that combines symbiotic organisms search (SOS) and ant colony optimization (ACO) is proposed to calculate the optimal or near-optimal assembly sequence. Several of the ACO parameter values are given, and the remaining ones are adaptively optimized by SOS. Thus, the complexity of ACO parameter assignment is greatly reduced. Compared with the ACO algorithm, the hybrid SOS-ACO algorithm finds optimal or near-optimal assembly sequences in fewer iterations. SOS-ACO is also robust in identifying the best assembly sequence in nearly every experiment. Lastly, the performance of SOS-ACO when the given ACO parameters are changed is analyzed through experiments. Experimental results reveal that SOS-ACO has good adaptive capability to various values of given parameters and can achieve competitive solutions.

关键词: assembly sequence planning     ant colony optimization     symbiotic organisms search     parameter optimization    

Offline motion planning and simulation of two-robot welding coordination

Tie ZHANG, Fan OUYANG

《机械工程前沿(英文)》 2012年 第7卷 第1期   页码 81-92 doi: 10.1007/s11465-012-0309-4

摘要:

This paper focuses on the two-robot welding coordination of complex curve seam which means one robot grasp the workpiece, the other hold the torch, the two robots work on the same workpiece simultaneously. This paper builds the dual-robot coordinate system at the beginning, and three point calibration method of two robots’ relative base coordinate system is presented. After that, the non master/slave scheme is chosen for the motion planning, the non master/slave scheme sets the poses versus time function of the point u on the workpiece, and calculates the two robot end effecter trajectories through the constrained relationship matrix automatically. Moreover, downhand welding is employed which can guarantee the torch and the seam keep in good contact condition all the time during the welding. Finally, a Solidworks-SimMechanics simulation platform is established, and a simulation of curved steel pipe welding is conducted. The results of the simulation illustrate the welding process can meet the requirements of downhand welding, the joint displacement curves are smooth and continuous and no joint velocities are out of working scope.

关键词: complex curve seam     two robots     coordinated welding     motion planning    

An uncertain energy planning model under carbon taxes

Hongkuan ZANG, Yi XU, Wei LI, Guohe HUANG, Dan LIU

《环境科学与工程前沿(英文)》 2012年 第6卷 第4期   页码 549-558 doi: 10.1007/s11783-012-0414-y

摘要: In this study, an interval fuzzy mixed-integer energy planning model (IFMI-EPM) is developed under considering the carbon tax policy. The developed IFMI-EPM incorporates techniques of interval-parameter programming, fuzzy planning and mixed-integer programming within a general energy planning model. The IFMI-EPM can not only be used for quantitatively analyzing a variety of policy scenarios that are associated with different levels of carbon tax policy, but also tackle uncertainties expressed as discrete intervals and fuzzy sets in energy and environment systems. Considering low, medium and high carbon tax rates, the model is applied to an ideal energy and environment system. The results indicate that reasonable solutions have been generated. They can be used for generating decision alternatives and thus help decision makers identify desired carbon tax policy.

关键词: energy     carbon tax     planning     uncertainty     fuzzy    

High-efficiency inspecting method for mobile robots based on task planning for heat transfer tubes in

《机械工程前沿(英文)》 2023年 第18卷 第2期 doi: 10.1007/s11465-022-0741-z

摘要: Many heat transfer tubes are distributed on the tube plates of a steam generator that requires periodic inspection by robots. Existing inspection robots are usually involved in issues: Robots with manipulators need complicated installation due to their fixed base; tube mobile robots suffer from low running efficiency because of their structural restricts. Since there are thousands of tubes to be checked, task planning is essential to guarantee the precise, orderly, and efficient inspection process. Most in-service robots check the task tubes using row-by-row and column-by-column planning. This leads to unnecessary inspections, resulting in a long shutdown and affecting the regular operation of a nuclear power plant. Therefore, this paper introduces the structure and control system of a dexterous robot and proposes a task planning method. This method proceeds into three steps: task allocation, base position search, and sequence planning. To allocate the task regions, this method calculates the tool work matrix and proposes a criterion to evaluate a sub-region. And then all tasks contained in the sub-region are considered globally to search the base positions. Lastly, we apply an improved ant colony algorithm for base sequence planning and determine the inspection orders according to the planned path. We validated the optimized algorithm by conducting task planning experiments using our robot on a tube sheet. The results show that the proposed method can accomplish full task coverage with few repetitive or redundant inspections and it increases the efficiency by 33.31% compared to the traditional planning algorithms.

关键词: steam generator transfer tubes     mobile robot     dexterous structure     task planning     efficient inspection    

Maximum independent set in planning freight railway transportation

Gainanov Damir N., Mladenovic NENAD, Rasskazova V. A.

《工程管理前沿(英文)》 2018年 第5卷 第4期   页码 499-506 doi: 10.15302/J-FEM-2018031

摘要:

This work is devoted to the problem of planning of freight railway transportation. We define a special conflict graph on the basis of a set of acceptable train routes. The investigation aims to solve the classical combinatorial optimization problem in relation to the maximum independent set of vertices in undirected graphs. The level representation of the graph and its tree are introduced. With use of these constructions, the lower and upper bounds for the number of vertices in the maximum independent set are obtained.

关键词: independent set     algorithm     planning of transportation     two-sided estimate    

Energy storage resources management: Planning, operation, and business model

《工程管理前沿(英文)》   页码 373-391 doi: 10.1007/s42524-022-0194-4

摘要: With the acceleration of supply-side renewable energy penetration rate and the increasingly diversified and complex demand-side loads, how to maintain the stable, reliable, and efficient operation of the power system has become a challenging issue requiring investigation. One of the feasible solutions is deploying the energy storage system (ESS) to integrate with the energy system to stabilize it. However, considering the costs and the input/output characteristics of ESS, both the initial configuration process and the actual operation process require efficient management. This study presents a comprehensive review of managing ESS from the perspectives of planning, operation, and business model. First of all, in terms of planning and configuration, it is investigated from capacity planning, location planning, as well as capacity and location combined planning. This process is generally the first step in deploying ESS. Then, it explores operation management of ESS from the perspectives of state assessment and operation optimization. The so-called state assessment refers to the assessment of three aspects: The state of charge (SOC), the state of health (SOH), and the remaining useful life (RUL). The operation optimization includes ESS operation strategy optimization and joint operation optimization. Finally, it discusses the business models of ESS. Traditional business models involve ancillary services and load transfer, while emerging business models include electric vehicle (EV) as energy storage and shared energy storage.

关键词: energy storage system     energy storage resources management     planning configuration     operational management     business model    

我国乡村规划的理论与应用研究

郐艳丽,王璇

《中国工程科学》 2019年 第21卷 第2期   页码 21-26 doi: 10.15302/J-SSCAE-2019.02.018

摘要:

本文按照我国城乡关系演进过程,将乡村规划理论演进划分为传统城乡交融背景下乡村建设(新中国成立前)、现代城乡分离背景下乡村规划(新中国成立后—2016年)和新时代城乡一体化背景乡村治理(2017年迄今)三个阶段,总结不同阶段乡村规划理论和乡村建设、管理特征。我国传统乡村规划理论包括以风水理论为基础的物质性规划建设理论和人文化治理思想与方法,两者相辅相成。建国以后,尤其是改革开放以来,乡村规划运用城市规划的相关理论指导乡村实践,在城乡关系的大背景下不断演进,通过乡村规划许可证实施简易化行政许可制度。近些年乡村规划脱胎于城市规划的反思与转型,融入多学科理论,探索发展本源。

关键词: 乡村规划     城市规划     正式治理     公共政策     公共产品    

Big Data to support sustainable urban energy planning: The EvoEnergy project

Moulay Larbi CHALAL, Benachir MEDJDOUB, Nacer BEZAI, Raid SHRAHILY

《工程管理前沿(英文)》 2020年 第7卷 第2期   页码 287-300 doi: 10.1007/s42524-019-0081-9

摘要: Energy sustainability is a complex problem that needs to be tackled holistically by equally addressing other aspects such as socio-economic to meet the strict CO emission targets. This paper builds upon our previous work on the effect of household transition on residential energy consumption where we developed a 3D urban energy prediction system (EvoEnergy) using the old UK panel data survey, namely, the British household panel data survey (BHPS). In particular, the aim of the present study is to examine the validity and reliability of EvoEnergy under the new UK household longitudinal study (UKHLS) launched in 2009. To achieve this aim, the household transition and energy prediction modules of EvoEnergy have been tested under both data sets using various statistical techniques such as Chow test. The analysis of the results advised that EvoEnergy remains a reliable prediction system and had a good prediction accuracy (MAPE  5%) when compared to actual energy performance certificate data. From this premise, we recommend researchers, who are working on data-driven energy consumption forecasting, to consider merging the BHPS and UKHLS data sets. This will, in turn, enable them to capture the bigger picture of different energy phenomena such as fuel poverty; consequently, anticipate problems with policy prior to their occurrence. Finally, the paper concludes by discussing two scenarios of EvoEnergy development in relation to energy policy and decision-making.

关键词: urban energy planning     sustainable planning     Big Data     household transition     energy prediction    

A novel approach for remanufacturing process planning considering uncertain and fuzzy information

《机械工程前沿(英文)》 2021年 第16卷 第3期   页码 546-558 doi: 10.1007/s11465-021-0639-1

摘要: Remanufacturing, as one of the optimal disposals of end-of-life products, can bring tremendous economic and ecological benefits. Remanufacturing process planning is facing an immense challenge due to uncertainties and fuzziness of recoverable products in damage conditions and remanufacturing quality requirements. Although researchers have studied the influence of uncertainties on remanufacturing process planning, very few of them comprehensively studied the interactions among damage conditions and quality requirements that involve uncertain, fuzzy information. Hence, this challenge in the context of uncertain, fuzzy information is undertaken in this paper, and a method for remanufacturing process planning is presented to maximize remanufacturing efficiency and minimize cost. In particular, the characteristics of uncertainties and fuzziness involved in the remanufacturing processes are explicitly analyzed. An optimization model is then developed to minimize remanufacturing time and cost. The solution is provided through an improved Takagi–Sugeno fuzzy neural network (T-S FNN) method. The effectiveness of the proposed approach is exemplified and elucidated by a case study. Results show that the training speed and accuracy of the improved T-S FNN method are 23.5% and 82.5% higher on average than those of the original method, respectively.

关键词: remanufacturing     uncertain and fuzzy information     process planning     T-S FNN    

地铁线网规划中几个值得商榷的问题

全永燊

《中国工程科学》 2000年 第2卷 第4期   页码 75-82

摘要:

我国城市正在经历地铁建设大发展的时期,一个十分紧迫且十分重要的问题是在进行线路建设前如何做好地铁线网布局规划。文章结合近年来国内开展地铁线网规划的实践,探讨了地铁线网规划中的几个关键问题,包括线网合理规模的论证、线网空间形态与构架以及地铁线网与城市其它交通方式的衔接等问题。

关键词: 地铁     线网规划    

标题 作者 时间 类型 操作

Intelligent optimization of renewable resource mixes incorporating the effect of fuel risk, fuel cost and CO

Deepak KUMAR,D. K. MOHANTA,M. Jaya Bharata REDDY

期刊论文

Family planning technical services in China

Shang-Chun WU

期刊论文

Will Germany move into a situation with unsecured power supply?

Harald SCHWARZ

期刊论文

Enterprise-wide optimization of integrated planning and scheduling for refinery-petrochemical complex

期刊论文

Development and challenges of planning and scheduling for petroleum and petrochemical production

Fupei LI, Minglei YANG, Wenli DU, Xin DAI

期刊论文

Ant colony optimization for assembly sequence planning based on parameters optimization

Zunpu HAN, Yong WANG, De TIAN

期刊论文

Offline motion planning and simulation of two-robot welding coordination

Tie ZHANG, Fan OUYANG

期刊论文

An uncertain energy planning model under carbon taxes

Hongkuan ZANG, Yi XU, Wei LI, Guohe HUANG, Dan LIU

期刊论文

High-efficiency inspecting method for mobile robots based on task planning for heat transfer tubes in

期刊论文

Maximum independent set in planning freight railway transportation

Gainanov Damir N., Mladenovic NENAD, Rasskazova V. A.

期刊论文

Energy storage resources management: Planning, operation, and business model

期刊论文

我国乡村规划的理论与应用研究

郐艳丽,王璇

期刊论文

Big Data to support sustainable urban energy planning: The EvoEnergy project

Moulay Larbi CHALAL, Benachir MEDJDOUB, Nacer BEZAI, Raid SHRAHILY

期刊论文

A novel approach for remanufacturing process planning considering uncertain and fuzzy information

期刊论文

地铁线网规划中几个值得商榷的问题

全永燊

期刊论文